Environmental Impact:
The
Consultant should follow the process and procedures explained in the ESMF.
Environmental screening needs to be carried out at early stage to identify
potential Environmental issues and to decide level of
environmental investigation necessary .Two
Categories of risks should be clearly identified: first is risk to building from
Environmental factors, and second
is risk to environment due to the building. Also
identify whether the risk is
construction period or operational period risk. The Initial
Environmental Examination (IEE)
or an Environmental Impact Assessment (EIA)
process should start as early as
possible, if an IEE or an EIA is necessary, so that this
completed in time. Broadly, environmental
consideration (IEE or EIA or in other form)
will cover the following: baseline environmental conditions, potential
environmental
impacts and their mitigations
(both direct and indirect impacts, and impacts during
construction and/or operation),
opportunities for environmental enhancement, and
Proposed design and other
measures for protection of the environment.