Detailed design and quantity/cost estimates

Based on the collected information and results of the discussions mentioned above the consultants shall design the building, following the standard codes of practice, norms and guidelines. The relevant codes of IS for the design of Nepal National Building Code (NBC-1994), Municipality Norms, Rule and Regulation shall be followed. The list of all reference literature and materials shall be provided on the report. As mentioned  earlier, the design will, to the extent possible, be guided by environmental and climatic factors and reflect state of the art practice in environmental consideration. The consultants shall produce detailed design and all structural drawing as per Municipality Norms, Rule and Regulation and preparation of all documents need for Kathmandu Metropolitan City Office, consultants shall take certificate for further procedure with the help of DHM.

The consultants shall produce detailed quantity estimate of the building and its accessories including provisions of demolition of existing DHM office buildings. The consultants shall collect information on sources of materials and their lead distances and prepare rate schedules and cost estimates based on the standard norms and prevailing district rates.

The Consultants shall:-

i)  Prepare detailed design and drawings for:

a.     Architectural

b.     Structural

c.      Mechanical

d.     Electrical and Allied system

e.      Communication and Computer Networking

f.       Fire Alarm and Fire fighting system

g.     CCTV system

h.     AC system

i.       Water Supply and Sanitation (Sewerage, Drainageetc)

j.       Environmental enhancement and protection measures

k.     Interior detail

l.       Detailed list of furniture and equipment for the project

m.  Site Development Works

i)        Prepare Technical Specifications and cost estimate

ii)        Prepare Municipality Drawings and assist Employer for its approval

iii)     Prepare Bill of quantities for each building

iv)  Any other document necessary for the bidding process & construction permit.

Note:

• Drawings should include Design / Working drawings


• The Consultant shall conduct soil test on the site to determine its bearing capacities prior to carrying out the structural design of the project.

The consultant should present three dimensional animation of building to DHM

Deliverable shall include:-

a)    detailed design and Tender Drawings

b)    Municipality Drawings

c)     Detailed Cost Estimates, Work Specifications

d)    Complete set of Tender Documents