Technical
Feasibility study:
It should include
reviewing the available data, collecting, reviewing and analysis of field data
including topographic survey, nature and structure of surface soil and
subsurface soil including groundwater, and other information as required for
the study and conducting analysis to decide upon the technical feasibility of
the Technical and Administrative Building. The Consultant shall assess the
floor area requirements for the office and other purposes in consultation with
the DHM officials. A cost comparison of different types of Building shall be
made and discussed with the DHM before proceeding to Building site for soil
investigation. The Consultants shall also propose methodology for the
demolition of existing DHM office buildings and managing the materials
following demolition of buildings in consultation with DHM.
0 Reviews:
Post Your Review